
Scope
What we handle
Rough-in plumbing
Supply and drain layout set out to your design before the walls close.
Fixture relocation
Moving drains, which means getting the fall and the venting right, not just the pipe.
Venting
The part most often done badly, and the reason some renovated bathrooms smell.
Permits & inspections
We pull the municipal permit and meet the inspector on site.
Finish plumbing
Return visit after tile and cabinetry to set and test the fixtures.
The short answer
Renovation plumbing is mostly about what happens before the tile goes on. Depex handles the rough-in, drain relocation, venting, and pressure testing, books the City of Coquitlam inspection, and comes back for finish plumbing once your tile and cabinets are in — so nothing gets closed up before it has been signed off.
Signs it's time to call
- You are moving a toilet, sink, or shower to a new position
- Converting a tub to a curbless or walk-in shower
- Adding a bathroom, wet bar, or laundry to a basement
- Building or legalising a secondary suite
- Old galvanized or cast-iron pipe you would rather not tile over
Live answer 24/7 — no overtime charges.
Local detail
What's different about this job in the Tri-Cities
The single most common renovation mistake we get called in to correct is drain venting. When a fixture is moved a couple of metres and the vent is not extended or re-tied properly, the trap siphons dry every time the fixture is used — and a dry trap is an open pipe between your bathroom and the sewer. It smells, it fails inspection, and it is very cheap to do correctly at rough-in and very expensive to fix through finished tile. If your renovation involves moving anything that drains, this is the detail to get right first.
Answers
Bathroom & Kitchen Remodeling: common questions
The questions we get asked on almost every one of these calls.
When in the renovation should the plumber come?
Twice. Once at rough-in, after demolition and framing but before insulation and drywall, and once at finish, after tile and cabinets. Booking both slots at the start keeps your schedule intact — rough-in has to be inspected before anything gets covered.
Do I need a permit for a bathroom renovation in Coquitlam?
If you are altering, adding, or relocating plumbing, yes. A like-for-like fixture swap in the same location generally does not need one. We confirm with the municipality before quoting so the permit is in the price rather than a surprise.
Can you work with my contractor or designer?
Yes, and it goes better when we are involved early. A five-minute conversation at the layout stage often saves relocating a stack later.
Still stuck? Ask us directly
Book Depex
Get a straight answer and a flat price.
Tell us what's happening and we'll tell you what it takes to fix it — before we pick up a tool.

